Contract Award Information |
Bid Tab |
| Bid Date: | June 22, 2010 | |  |
| Location: | LITTLE CHUTE (Village of), Wisconsin |
| Project: | WASHINGTON STREET (WI Central Ltd Railroad - CTH 'OO' - Entrance to Dutch Harbor Mobile Home Park) & DUTCH BOYZ DEVELOPMENT / Contract L0001-990301-C |
| Contact: | Dennis R. Buschke, P.E. |
| Bid Date: | June 21, 2010 | |  |
| Location: | MACHESNEY PARK (Village Of), Illinois |
| Project: | PH I ROOSEVELT ROAD IMPROVEMENTS / Contract 05-00023-00-PV (McM No. M0031-750126) |
| Contact: | Chris Dopkins |
| Bid Date: | June 14, 2010 | |  |
| Location: | MENASHA UTILITY DISTRICT (Town of), Wisconsin |
| Project: | SOUTHWOOD DRIVE SANITARY SEWER RELAY / Contract M0004-900429 |
| Contact: | Brad D. Werner, P.E. |
| Bid Date: | June 07, 2010 | |  |
| Location: | GRAND CHUTE (Town of), Wisconsin |
| Project: | EVERGREEN DRIVE & STH '47' STREET CONSTRUCTION (Contract 5-2010) / G0006-990663-A |
| Contact: | Carl C. Sutter, P.E., CCS |
| Bid Date: | June 07, 2010 | |  |
| Location: | MACHESNEY PARK (Village Of), Illinois |
| Project: | M0031-790113 / 2009-2010 OVERLAYS |
| Contact: | Nick Arps |
| Bid Date: | June 07, 2010 | |  |
| Location: | GRAND CHUTE (Town of), Wisconsin |
| Project: | BUTTERFLY FIELDS RETENTION POND & STREET CONSTRUCTION / Contract 6-2010 (G0006-990663-B) |
| Contact: | Carl C. Sutter, P.E., CCS |
| Bid Date: | May 27, 2010 | |  |
| Location: | BELGIUM (Village of), Wisconsin |
| Project: | 2010 VICTORY ST & SOUTH AVE SANITARY SEWER & STORM SEWER RELAY / Contract B0002-900280 |
| Contact: | Matthew J. Greely, P.E. |
| Bid Date: | May 27, 2010 | | |
| Location: | BELGIUM (Village of), Wisconsin |
| Project: | HERITAGE PARK RESTROOM & CONCESSION BUILDING / Contract B0002-900350 |
| Contact: | Matthew J. Greely, P.E. |
| Bid Date: | May 27, 2010 | |  |
| Location: | BELGIUM (Village Of), Wisconsin |
| Project: | B0002-990439 / MAIN LIFT STATION IMPROVEMENTS |
| Contact: | Anthony S. Kappell, P.E. |
| Bid Date: | May 27, 2010 | | |
| Location: | BRILLION PUBLIC SCHOOL DISTRICT, Wisconsin |
| Project: | Window Replacement at Public Schools / Contract No. B0071-600118 |
| Contact: | Bill Long |
| Bid Date: | May 24, 2010 | |  |
| Location: | LAWRENCE (Town of), Wisconsin |
| Project: | WILLIAMS GRANT DRIVE CULVERT REPLACEMENT / Contract L0017-990610-A |
| Contact: | Matthew J. Greely, P.E. |
| Bid Date: | May 24, 2010 | |  |
| Location: | LAWRENCE (Tonw of), Wisconsin |
| Project: | HICKORY ROAD CULVERT REPLACEMENT / Contract L0017-990610-B |
| Contact: | Matthew J. Greely, P.E. |
| Bid Date: | May 17, 2010 | |  |
| Location: | KAUKAUNA (City Of), Wisconsin |
| Project: | K0006-990780 / METER STATION #10 CONSTRUCTION |
| Contact: | Brad Werner / Tom Kispert |
| Bid Date: | May 12, 2010 | |  |
| Location: | MOROCCO (Town Of), Indiana |
| Project: | M0554-580177 / WATER SYSTEM IMPROVEMENTS |
| Contact: | John Sturgill |
| Bid Date: | May 06, 2010 | |  |
| Location: | SOUTH BELOIT (City Of), Illinois |
| Project: | S0700-790146 / 2010 ROAD REPAIR PROGRAM |
| Contact: | Nick Arps |
| Bid Date: | May 05, 2010 | |  |
| Location: | MACHESNEY PARK (Village Of), Illinois |
| Project: | M0031-780167 / SYCAMORE LANE IMPROVEMENTS |
| Contact: | Chris Dopkins |
| Bid Date: | May 04, 2010 | |  |
| Location: | MENASHA (Town of), Wisconsin |
| Project: | 2010 CRACK SEAL PROGRAM / Contract M0003-900136-A |
| Contact: | Lee R. Reibold, P.E. |
| Bid Date: | May 04, 2010 | |  |
| Location: | MENASHA (Town of), Wisconsin |
| Project: | 2010 CHIP SEAL PROGRAM / Contract M0003-900136-B |
| Contact: | Lee R. Reibold,P.E. |
| Bid Date: | April 29, 2010 | Contract Awarded to: Larson & Larson Builders, Inc. Loves Park, IL $64,450.00 (Base + Alt. #1) |  |
| Location: | ROCKFORD (City Of), Illinois |
| Project: | 310-W-035 (R0018-900210) / WOMEN's RESTROOM IMPROVEMENTS |
| Contact: | Donald J. Voogt, P.E. |
| Bid Date: | April 27, 2010 | |  |
| Location: | HARRISON (Town of), Wisconsin |
| Project: | H0006-900741-B / ANDREW DR & HEARTHSTONE DR STORM SEWER DRAINAGE IMPROVEMENTS |
| Contact: | Lee R. Reibold, P.E. |
| Bid Date: | April 22, 2010 | Contract Awarded to: Bennett Construction, Inc. Pecatonica, IL 61063-0370 $131,000.00 |  |
| Location: | ROCKFORD (City Of), Illinois |
| Project: | 310-W-025 (R0018-900180) / WATER TOWER #2 ALTITUDE VALVE CONST |
| Contact: | Donald J. Voogt, P.E. |
| Bid Date: | April 15, 2010 | Contract Awarded to: Sommers Construction Co., Inc. Shiocton, Wisconsin $565,077.30 |  |
| Location: | CHILTON (City of), Wisconsin |
| Project: | MAIN STREET (USH '151') RECONSTRUCTION - Contract C0002-990449 / SCHOOL STREET RECONSTRUCTION - Contract C0002-900153 |
| Contact: | Michael R. Simon, P.E. |
| Bid Date: | April 08, 2010 | Contract Awarded to: V&T Painting, LLC Farmington Hills, MI $243,900.00 |  |
| Location: | OAKFIELD (Village Of), Wisconsin |
| Project: | O0016-900220 / 500,000-GAL ELEVATED WATER TANK |
| Contact: | Jeff Kellner, P.E. |
| Bid Date: | April 08, 2010 | Contract Awarded to: MCC, Inc. Appleton, Wisconsin $390,923.40 |  |
| Location: | SHERWOOD (Village of), Wisconsin |
| Project: | S0017-900190.02-A / 2010 PAVING PROGRAM (REBID) |
| Contact: | Jennifer L. Schaff, P.E. |
| Bid Date: | April 08, 2010 | Contract Awarded to: Larson & Larson Builders, Inc. Loves Park, IL $66,960.00 (Base + Alt. Bid #1) |  |
| Location: | ROCKFORD (City Of), Illinois |
| Project: | 210-W-020 / R0018-900197 - WELL HOUSE U35 MODIFICATIONS |
| Contact: | Donald J. Voogt, P.E. |
| Bid Date: | April 05, 2010 | Contract Awarded to: Roger Bowers Construction, Inc. Kaukauna, Wisconsin $165,133.00 |  |
| Location: | MENASHA (Town of), Wisconsin |
| Project: | M0003-900203 / SOUTHWOOD DRIVE STORM SEWER DRAINAGE IMPROVEMENTS |
| Contact: | Lee R. Reibold |
| Bid Date: | March 30, 2010 | |  |
| Location: | ROCKFORD (City Of), Illinois |
| Project: | 110-W-003 / R0018-990794 / WELL U10 TREATMENT FACILITY ADDITION |
| Contact: | Donald J. Voogt, P.E. |
| Bid Date: | March 30, 2010 | Contract Awarded to: Northeast Asphalt, Inc. Fond du Lac, Wisconsin $85,874.53 |  |
| Location: | CEDAR GROVE (Village of), Wisconsin |
| Project: | C0001-900154 / PHOENIX AVENUE STREET RECONSTRUCTION |
| Contact: | Phillip T. Kleman |
| Bid Date: | March 24, 2010 | Contract Awarded to: Great Lakes TV Seal, Inc. Green Bay, Wisconsin $70,561.23 |  |
| Location: | KIMBERLY (Village of), Wisconsin |
| Project: | K0001-900243 / 2010 SANITARY SEWER CLEANING & TELEVISING and SANITARY MANHOLE INSPECTIONS |
| Contact: | Brad D. Werner, P.E. |
| Bid Date: | March 24, 2010 | Contract Awarded to: Fischer-Ulman Construction, Inc. Appleton, Wisconsin $48,137.00 |  |
| Location: | KIMBERLY (Village of), Wisconsin |
| Project: | K0001-900139 / 2010 GREEN DOT SIDEWALK PROGRAM |
| Contact: | Brad D. Werner, P.E. |
| Bid Date: | March 23, 2010 | Contract Awarded to: Tom Van Handel Corporation Appleton, Wisconsin $65,011.78 |  |
| Location: | GARNERS CREEK COMMUNITIES STORM WATER UTILITY, Wisconsin |
| Project: | G0035-900115 / 2010 EROSION CONTROL PROJECTS |
| Contact: | Carl C. Sutter, P.E., C.C.S. |
| Bid Date: | March 23, 2010 | |  |
| Location: | DUNELAND SCHOOL CORPORATION Town Of Chesterton, Indiana |
| Project: | D0528-580151 / SANITARY SEWER & WATER MAIN |
| Contact: | Randy Peterson |
| Bid Date: | March 11, 2010 | Contract Awarded to: MCC, Inc. Appleton, Wisconsin $270,382.65 |  |
| Location: | CHILTON (City Of), Wisconsin |
| Project: | 2010 ASPHALT PAVING & UTILITY TRENCH REPAIR (C0002-900178) |
| Contact: | Dennis Buschke, P.E. |
| Bid Date: | March 11, 2010 | Contract Awarded to: PTS Contractors, Inc. Green Bay, Wisconsin $296,323.71 |  |
| Location: | CHILTON (City of), Wisconsin |
| Project: | FIELD LANE SUBDIVISION CONSTRUCTION & UTICA STREET RECONSTRUCTION (Contract C0002-990639) |
| Contact: | Dennis R. Buschke, P.E. |
| Bid Date: | March 10, 2010 | |  |
| Location: | ROCKTON (City Of), Illinois |
| Project: | R0013-770127-A / WASTEWATER TREATMENT PLANT IMPROVEMENTS |
| Contact: | Tim Bronn |
| Bid Date: | March 05, 2010 | Contract Awarded to: Northeast Asphalt, Inc. Greenville, Wisconsin $293,100.75 |  |
| Location: | BRILLION (City Of), Wisconsin |
| Project: | B0004-990720 / 2010 EAST NATIONAL AVENUE RECONSTRUCTION and 2010 ACHIEVEMENT DRIVE & CARSTENS STREET PAVING |
| Contact: | Ronald J. Wolf, P.E. |
| Bid Date: | March 03, 2010 | Contract Awarded to: Vinton Construction Company Manitowoc, Wisconsin $493,183.53 |  |
| Location: | KIMBERLY (Village Of), Wisconsin |
| Project: | K0001-990773 / 2010 STREET CONSTRUCTION |
| Contact: | Brad Werner, P.E. |
| Bid Date: | March 02, 2010 | |  |
| Location: | SOUTH BELOIT (City Of), Illinois |
| Project: | S0700-790145 / PH I SANITARY SEWER CLEANING & TELEVISING |
| Contact: | Illinois Office |
| Bid Date: | March 01, 2010 | Contract Awarded to: Northeast Asphalt, Inc. Greenville, WI $494,751.00 |  |
| Location: | MENASHA (Town Of), Wisconsin |
| Project: | M0003-900136-C / 2010 ASPHALT STREET RESURFACING PROGRAM |
| Contact: | Lee R. Reibold, P.E. |
| Bid Date: | February 26, 2010 | |  |
| Location: | SHERWOOD (Village of), Wisconsin |
| Project: | S0017-900190-A / 2010 PAVING PROGRAM (Contract A) |
| Contact: | Jennifer L. Schaff, P.E. |
| Bid Date: | February 26, 2010 | Contract Awarded to: Scott Construction, Inc. Lake Dalton, Wisconsin $41,176.00 |  |
| Location: | SHERWOOD (Village Of), Wisconsin |
| Project: | S0017-900190-B / 2010 CHIP SEALING PROGRAM (Contract B) |
| Contact: | Jennifer L. Schaff, P.E. |
| Bid Date: | February 25, 2010 | Contract Awarded to: Donald Hietpas & Sons Little Chute, WI Base Bid $512,472.75 |  |
| Location: | TOWN OF MENASHA UTILITY DISTRICT, Wisconsin |
| Project: | M0004-990348 / EAST SHADY LANE WATER RELAY |
| Contact: | Jeff Hansen |
| Bid Date: | February 25, 2010 | Contract Awarded to: Donald Hietpas & Sons Little Chute, WI Base Bid $221,520.50 |  |
| Location: | TOWN OF MENASHA UTILITY DISTRICT, Wisconsin |
| Project: | M0004-990596 / MANITOWOC ROAD WATER RELAY |
| Contact: | Jeff Hansen |
| Bid Date: | February 23, 2010 | Contract Awarded to: Northeast Asphalt, Inc. Greenville, Wisconsin $653,590.90 |  |
| Location: | HARRISON (Town Of), Wisconsin |
| Project: | H0006-900741 / 2010 ASPHALT PAVING PROGRAM |
| Contact: | Lee R. Reibold, P.E. |
| Bid Date: | February 22, 2010 | Contract Awarded to: MCC, Inc. Appleton, Wisconsin $25,200.90 |  |
| Location: | GRAND CHUTE (Town Of), Wisconsin |
| Project: | Contract 3-2010 (G0006-900107) / HOT MIX ASPHALT PAVING PROGRAM |
| Contact: | Carl C. Sutter, P.E., C.C.S. |
| Bid Date: | February 22, 2010 | |  |
| Location: | GRAND CHUTE (Town Of), Wisconsin |
| Project: | Contract 2-2010 (G0006-990552) / COLLEGE AVENUE FRONTAGE ROAD URBANIZATION |
| Contact: | Carl C. Sutter, P.E. |
| Bid Date: | January 27, 2010 | Contract Awarded to: L.C. United Painting, LLC. Sterling Heights, MI $337,000.00 |  |
| Location: | WASHINGTON (City Of), Illinois |
| Project: | W0701-990705 / #2 TOWER REPAINTING |
| Contact: | Jeffrey A. Kellner, P.E. |
| Bid Date: | December 21, 2009 | |  |
| Location: | ROCKTON, City Of, Illinois |
| Project: | R0013-760116 (Re-Bid) / RIVER STREET PUMP STATION IMPROVEMENTS |
| Contact: | Timothy C. Bronn, P.E., BCEE |
| Bid Date: | November 12, 2009 | |  |
| Location: | LITTLE CHUTE (Village Of), Wisconsin |
| Project: | L0001-990699 / BUCHANAN POND EXPANSION |
| Contact: | Phillp T. Kleman |
| Bid Date: | November 12, 2009 | |  |
| Location: | KIMBERLY (Village Of), Wisconsin |
| Project: | K0001-990708 / COURTLAND COURT POND |
| Contact: | Brad D. Werner,P.E. |
| Bid Date: | November 12, 2009 | |  |
| Location: | MENASHA (Town Of), Wisconsin |
| Project: | M0003-990673 / INDEPENDENCE POND |
| Contact: | Andy W. Schmidt, P.E. |
| Bid Date: | October 08, 2009 | |  |
| Location: | KAUKAUNA AREA SCHOOL DISTRICT, Wisconsin |
| Project: | Haen Elementary School - WINDOW REPLACEMENT |
| Contact: | Tom Olson |
| Bid Date: | October 05, 2009 | |  |
| Location: | LITTLE CHUTE (Village Of), Wisconsin |
| Project: | L0001-990301 / NORTH AVENUE (CTH 'OO') Washington Street - Vandenbroek Road / Right Turn Lane at Kraft Foods / PARADISE DRIVE ASPHALT MILL & OVERLAY |
| Contact: | Michael R. Simon, P.E. |
| Bid Date: | September 28, 2009 | |  |
| Location: | GRAND CHUTE SANITARY DISTRICT #3, Wisconsin |
| Project: | REVISED Bid Date: September 30, 2009 / Contract 7-2009 MUD CREEK DITCH PROFILING (McM. No. G0003-960481) |
| Contact: | Carl C. Sutter, P.E. |
| Bid Date: | September 24, 2009 | Contract Awarded to: Sjostrom & Sons, Inc. Rockford, IL $334,000.00 - Base Bid |  |
| Location: | ROCKFORD (City Of) , Illinois |
| Project: | 809-PW-151 (McM. R0018-990254.00) / WATER OPERATIONS CENTER - LABORATORY & OFFICE RENOVATIONS |
| Contact: | Donadl J. Voogt, P.E. |
| Bid Date: | September 21, 2009 | |  |
| Location: | MARINETTE (City of), Wisconsin |
| Project: | NEW BID DATE & TIME - M0023-980161 / ANGWALL, MURRAY & PARSEK WET POND UPGRADES |
| Contact: | Brad D. Werner, P.E. |
| Bid Date: | September 17, 2009 | Contract Awarded to: CB&I Constructors, Inc. Clive, IA $1,660,000.00 |  |
| Location: | MENDOTA (City Of), Illinois |
| Project: | M0701-790101 / NEW 750,000-GALLON ELEVATED WATER TANK |
| Contact: | Jeff Kellner |
| Bid Date: | September 17, 2009 | | |
| Location: | MENASHA UTILITY DISTRICT (Town Of) - Winnebago Cou, Wisconsin |
| Project: | M0004-970225-D / WELL #8 PUMPING EQUIPMENT |
| Contact: | Kari L. Dennis, P.E. |
| Bid Date: | September 17, 2009 | |  |
| Location: | CHILTON (City Of), Wisconsin |
| Project: | C0002-980678 / UPTOWN PARKING LOT |
| Contact: | Dennis R. Buschke, P.E. |
| Bid Date: | September 10, 2009 | Contract Awarded to: Miron Construction Co., Inc. Neenah, WI $4,962,910.00 |  |
| Location: | HORTONVILLE (Village Of), Wisconsin |
| Project: | H0004-970503-A / WASTEWATER TREATMENT FACILITY MODIFICATIONS |
| Contact: | Kari L. Dennis, P.E. |
| Bid Date: | September 10, 2009 | Contract Awarded to: A: Vinton Constr. $1,888,394.00 B: Roger Bowers $91,243.75 |  |
| Location: | CHILTON (City Of), Wisconsin |
| Project: | C0002-990447-A / HEIMANN STREET LIFT STATION And C0002-990447-B - FORCE MAIN CONSTRUCTION |
| Contact: | Donald J. Voogt, P.E. |
| Bid Date: | September 08, 2009 | Contract Awarded to: Green Bay Pipe & TV, LLC Green Bay, WI $24,640.00 |  |
| Location: | GRAND CHUTE SANITARY DISTRICT #2, Wisconsin |
| Project: | G0005-990586-B / 2009 SANITARY SEWER TELEVISING |
| Contact: | Rodney L. Manthey |
| Bid Date: | September 08, 2009 | Contract Awarded to: Wood Sewer & Excavating, Inc. New London, WI $56,950.00 |  |
| Location: | GRAND CHUTE SANITARY DISTRICT #2, Wisconsin |
| Project: | G0005-990586-A / 2009 SANITARY MANHOLE REHABILITATION |
| Contact: | Rodney Manthey |
| Bid Date: | September 03, 2009 | |  |
| Location: | MOSINEE (City Of), Wisconsin |
| Project: | M0011-990373 / WASTEWATER TREATMENT FACILITY IMPROVEMENTS |
| Contact: | Thomas J, Kispert, P.E., BCEE, CCS |
| Bid Date: | September 03, 2009 | Contract Awarded to: Lee's Contracting / Fabricating, Inc. Little Chute, Wisconsin $156,000.00 |  |
| Location: | HOLLAND (Town Of) SANITARY DISTRICT #1, Wisconsin |
| Project: | H0003-990231 / WELL #2 PUMPHOUSE SOFTENEER REPLACEMENT PROJECT |
| Contact: | Chad T. Olsen, P.E. |
| Bid Date: | September 01, 2009 | |  |
| Location: | SHERWOOD (Village Of), Wisconsin |
| Project: | S0011-990270-A / VILLAGE OF SHERWOOD - CITY OF APPLETON TRANSMISSION WATER MAIN |
| Contact: | Jennifer L. Schaff, P.E. |
| Bid Date: | September 01, 2009 | Contract Awarded to: Miron Construction Company, Inc. Neenah, Wisconsin $244,938.00 |  |
| Location: | SHERWOOD (Village Of), Wisconsin |
| Project: | S0011-990270-B / NEW METER STATION & WELL #5 PUMPHOUSE MODIFICATIONS |
| Contact: | Anthony S. Kappell, P.E. |
| Bid Date: | August 31, 2009 | |  |
| Location: | TWO RIVERS (City Of), Wisconsin |
| Project: | T0007-990387 REVISED BID DATE (Per Addendum #3) / 2009 STORM WATER PONDS (West Hawthorne Pond, South Columbus Pond, Wentker Pond, Two Rivers High School Pond & Carron Pond) |
| Contact: | Nick A. Vande Hey, P.E. |
| Bid Date: | August 31, 2009 | | |
| Location: | KAUKAUNA (City Of), Wisconsin |
| Project: | K0006-980618 / NORTH SIDE INTERCEPTOR SEWER CANAL CROSSINGS |
| Contact: | Brad D. Werner, P.E. |
| Bid Date: | August 31, 2009 | |  |
| Location: | COMBINED LOCKS (Village Of), Wisconsin |
| Project: | C0006-980652 / RIVERVIEW POND |
| Contact: | Nick A. Vande Hey, P.E. |
| Bid Date: | August 31, 2009 | | |
| Location: | KAUKAUNA (City Of), Wisconsin |
| Project: | K0006-990382 / HORSESHOE PARK POND |
| Contact: | Steve K. Rosenbeck |
| Bid Date: | August 31, 2009 | Contract Awarded to: Radtke Contractors, Inc. Winneconne, WI $387,221.05 |  |
| Location: | NEENAH (Town Of), Wisconsin |
| Project: | N0003-990393 / HERZIGER POND |
| Contact: | Ben T. Hamblin, P.E. |
| Bid Date: | August 27, 2009 | |  |
| Location: | SHEBOYGAN (City Of) - Dept. Of Public Works, Wisconsin |
| Project: | S0014-980410 / WESTERN INTERCEPTOR Cured-In-Place Pipe & Manhole Rehab. |
| Contact: | Amy J. Vaclavik, P.E, BCEE |
| Bid Date: | August 26, 2009 | Contract Awarded to: Contract A - Miron Construction Co, Inc., Neenah, Contract B - CTW Corporation, Lannon, WI Contract A - $790,300.00 / Contract B - $52,205.00 |  |
| Location: | LOMIRA (Village Of), Wisconsin |
| Project: | L0002-990220-A / GENERAL CONSTRUCTION - WELL #1 PUMPHOUSE & RADIUM TREATMENT SYSTEM & CONTRACT L0002-990229-B - PUMPING EQUPMENT CONSTRUCTION FOR WELL #1 PUMPHOUSE |
| Contact: | Anthony Kappell, P.E. |
| Bid Date: | August 26, 2009 | Contract Awarded to: RC Excavating, Inc. Suamico, WI $183,874.86 |  |
| Location: | ALLOUEZ (Village Of), Wisconsin |
| Project: | A0012-990376 / KIWANIS PARK POND |
| Contact: | Jeffrey M. Hansen, P.E. |
| Bid Date: | August 26, 2009 | Contract Awarded to: RC Excavating, Inc. Suamico, WI $237,146.00 |  |
| Location: | ALLOUEZ (Village Of), Wisconsin |
| Project: | A0012-990375 / HOFFMAN ROAD POND |
| Contact: | Jeffrey M. Hansen, P.E. |
| Bid Date: | August 24, 2009 | |  |
| Location: | LITTLE CHUTE (Village Of), Wisconsin |
| Project: | L0001-990377 / HEESAKKER POND |
| Contact: | Phillip Kleman |
| Bid Date: | August 24, 2009 | |  |
| Location: | LITTLE CHUTE (Village Of), Wisconsin |
| Project: | L0001-990154 / EVERGREEN POND |
| Contact: | Phillip Kleman |
| Bid Date: | August 19, 2009 | Contract Awarded to: Gene Frederickson Trucking, Inc. Kaukauna, WI $139,835.00 |  |
| Location: | BUCHANAN (Town Of), Wisconsin |
| Project: | B0008-980295 / SPEEDWAY HEIGHTS POND |
| Contact: | Phillip T. Kleman |
| Bid Date: | August 17, 2009 | |  |
| Location: | MENASHA (Town Of), Wisconsin |
| Project: | M0003-980122 / NORTHERN ROAD POND |
| Contact: | Phillip T. Kleman |
| Bid Date: | August 17, 2009 | Contract Awarded to: J&E Construction Co., Inc. Stockbridge, WI $1,201,100.99 |  |
| Location: | MENASHA (Town Of), Wisconsin |
| Project: | M0003-980146 / TAYCO POND |
| Contact: | Andy W. Schmidt, P.E. |
| Bid Date: | August 13, 2009 | Contract Awarded to: Michels Corporation Brownsville, WI $212,624.00 |  |
| Location: | FREDONIA (Village of), Wisconsin |
| Project: | F0002-990388 / 2009 CIPP PROJECT |
| Contact: | Dennis R. Buschke, P.E. |
| Bid Date: | August 13, 2009 | Contract Awarded to: PTS Contractors, Inc. Green Bay, WI $130,216.50 |  |
| Location: | FREDONIA (Village of), Wisconsin |
| Project: | F0002-990389 / PARK AVENUE SANITARY SEWER RECONSTRUCTION |
| Contact: | Dennis R. Buschke, P.E. |
| Bid Date: | August 12, 2009 | Contract Awarded to: Fischer-Ulman Construction, Inc. Appleton, WI $41,665.00 |  |
| Location: | KIMBERLY (Village Of), Wisconsin |
| Project: | K0001-990416 / 2009 GREEN DOT SIDEWALK PROGRAM |
| Contact: | Brad D. Werner, P.E. |
| Bid Date: | August 11, 2009 | Contract Awarded to: Ptaschinski Construction, Inc. Beaver Dam, WI $781,604.74 |  |
| Location: | CEDAR GROVE (Village Of), Wisconsin |
| Project: | C0001-980807 / SOUTH MAIN STREET SIDEWALK & BIKE LANES |
| Contact: | Michael R. Simon, P.E. |
| Bid Date: | August 05, 2009 | Contract Awarded to: The Selmer Company Green Bay, Wisconsin $383,544.00 |  |
| Location: | EGG HARBOR (Village Of), Wisconsin |
| Project: | E0003-990181 / HEADWORKS IMPROVEMENTS |
| Contact: | Thomas J. Kispert, P.E., BCEE, CCS |
| Bid Date: | July 23, 2009 | Contract Awarded to: Water Well Solutions Service Group Oconomowoc, WI $64,932.00 |  |
| Location: | MENASHA UTILITY DISTRICT (Town Of), Wisconsin |
| Project: | M0004-970225-C / WELL #7 - INSTALL NEW PUMPING EQUIPMENT |
| Contact: | Kari L. Dennis, P.E. |
| Bid Date: | July 22, 2009 | |  |
| Location: | OCONTO COUNTY, Wisconsin |
| Project: | O0601-690124 / NEW LOADING DOCK RAMP Oconto Dept. of Solid Waste - Recycling Center |
| Contact: | Wiliam F. Long |
| Bid Date: | July 16, 2009 | |  |
| Location: | MACHESNEY PARK (Village Of), Illinois |
| Project: | M0031-780165 / 2009 PAVEMENT MAINTENANCE PROGRAM |
| Contact: | Tim Bronn |
| Bid Date: | July 16, 2009 | |  |
| Location: | BRILLION PUBLIC SCHOOL DISTRICT, Wisconsin |
| Project: | B0071-690122 / 2009 REMODELING PROJECTS at the Elementary / Middle School & High School |
| Contact: | Bill Long / Tom Olson |
| Bid Date: | July 13, 2009 | Contract Awarded to: AG Excavating dba Waino Excavating Green Bay, WI $449,697.25 |  |
| Location: | STURGEON BAY UTILITIES (City Of Sturgeon Bay), Wisconsin |
| Project: | S0007-980314 / 2009 HUDSON AVENUE RECONSTRUCTION |
| Contact: | Ron Wolf, P.E. |
| Bid Date: | July 09, 2009 | Contract Awarded to: Mechanical, Inc. Waukesha, WI $100,735.00 |  |
| Location: | FREDONIA, Wisconsin |
| Project: | F0002-990380 / Waterwater Treatment Facility Modifications Raw Sewage Pump Upgrade |
| Contact: | Kari Dennis |
| Bid Date: | July 07, 2009 | |  |
| Location: | EARLVILLE (City Of), Illinois |
| Project: | E0004-790115 - CHESTNUT / STILSON / WINTHROP IMPROVEMENTS |
| Contact: | Illinois Office |
| Bid Date: | June 24, 2009 | Contract Awarded to: J&E Construction Co., Inc. Stockbridge, WI $687,236.87 |  |
| Location: | GARNERS CREEK COMMUNITIES STORM WATER UTILITY, Wisconsin |
| Project: | Springfield Pond |
| Contact: | Phil Kleman |
| Bid Date: | June 23, 2009 | Contract Awarded to: Roger Bowers Construction, Inc. Kaukauna, WI $202,210.00 |  |
| Location: | HARRISON (Town Of), Wisconsin |
| Project: | Red Maple Meadow Storm Sewer & Drainage Improvements |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | June 22, 2009 | Contract Awarded to: Northeast Asphalt, Inc. Fond du Lac, WI $155,490.00 |  |
| Location: | BRILLION (City of), Wisconsin |
| Project: | 2009 FAWN RIDGE - DEER RUN ASPHALT PAVING |
| Contact: | Ronald Wolf, P.E. |
| Bid Date: | June 22, 2009 | Contract Awarded to: Dorner, Inc. Luxemburg, WI $277,878.50 |  |
| Location: | BRILLION (City Of), Wisconsin |
| Project: | 2009 PARKWAY DRIVE RECONSTRUCTION |
| Contact: | Ronald J. Wolf, P.E. |
| Bid Date: | June 22, 2009 | Contract Awarded to: Vinton Construction Co. Manitowoc, WI $132,845.00 |  |
| Location: | BRILLION (City Of), Wisconsin |
| Project: | 2009 PROGRESS DRIVE CONCRETE PAVING |
| Contact: | Ronald J. Wolf, P.E. |
| Bid Date: | June 18, 2009 | |  |
| Location: | SYCAMORE (City Of), Illinois |
| Project: | Wastewater Treatment Plant Improvements Phase I - Solids Handling Improvements |
| Contact: | Thomas J. Kispert, P.E., BCEE |
| Bid Date: | June 10, 2009 | Contract Awarded to: Scott Construction, Inc. Lake Delton, WI $172,105.64 |  |
| Location: | Harrison (Town Of), Wisconsin |
| Project: | 2009 CHIP SEAL PROGRAM |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | May 28, 2009 | Contract Awarded to: Gene Frederickson Trucking & Excavating Kaukauna, WI $553,093.50 |  |
| Location: | GARNERS CREEK COMMUNITIES STORM WATER UTILITY, Wisconsin |
| Project: | Main Street Pond & Regal Pond |
| Contact: | Phillip Kleman |
| Bid Date: | May 26, 2009 | Contract Awarded to: Reed C. Meltz & Son's, Inc. Black Creek, WI $79,127.75 |  |
| Location: | GRAND CHUTE SANITARY DIST. #1, Wisconsin |
| Project: | Woods Edge Drive Water Main Replacement |
| Contact: | Carl C. Sutter, P.E. |
| Bid Date: | May 21, 2009 | Contract Awarded to: National Salvage & Service Corporation Clear Creek, IN 47426 $884,000.00 |  |
| Location: | ROCKFORD (City Of), Illinois |
| Project: | 405-W-065 (R0018-990249) Water Treatment Improvements RESERVOIR DEMOLITION At Wells U10, U15 & U18 |
| Contact: | Donald J. Voogt, P.E. |
| Bid Date: | May 18, 2009 | Contract Awarded to: J&E Construction Co., Inc. Stockbridge, WI $488,808.00 |  |
| Location: | Menasha (Town Of), Wisconsin |
| Project: | 2009 Street Reconstruction |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | May 14, 2009 | Contract Awarded to: Donald Hietpas & Sons, Inc. Little Chute, WI $99,616.50 |  |
| Location: | Brillion (City of), Wisconsin |
| Project: | 2009 Pagel Avenue Sewer & Water Main Reconstruction |
| Contact: | Ronald J. Wolf, P.E. |
| Bid Date: | May 14, 2009 | Contract Awarded to: Jossart Brothers, Inc. De Pere, WI $78,700.00 |  |
| Location: | Central Brown County Water Authority, Wisconsin |
| Project: | 2009 Air Release Vault Modification S-Phase II |
| Contact: | Ronald Wolf, P.E. |
| Bid Date: | May 14, 2009 | Contract Awarded to: Jossart Brothers, Inc. De Pere, WI $162,789.00 |  |
| Location: | Brillion (City Of), Wisconsin |
| Project: | 2009 Ryan Street Water Main Reconstruction |
| Contact: | Ronald Wolf, P.E. |
| Bid Date: | May 12, 2009 | Contract Awarded to: Mike Pusnik Enterprises, LLC W5732 Highway '10', Menasha, WI 54952 $47,754.00 + $17.00/cu.yd Soil Removal/Replacement |  |
| Location: | NEENAH WATER UTILITY - Citiy Of Neenah, Wisconsin |
| Project: | Contract N0002-990228 / Phase 2 - Sludge Storage Lagoon Embankment Repairs |
| Contact: | ANTHONY S. KAPPELL, P.E. |
| Bid Date: | May 11, 2009 | Contract Awarded to: Radtke Contractors, Inc. Winneconne, WI $589,196.85 |  |
| Location: | Menasha (Town Of), Wisconsin |
| Project: | Cold Spring Pond |
| Contact: | Andy Schmidt, P.E. |
| Bid Date: | May 08, 2009 | Contract Awarded to: Woleske Construction Green Bay, WI $106,428.80 |  |
| Location: | Cedar Grove (Village Of), Wisconsin |
| Project: | 2009 Water Main Reconstruction |
| Contact: | Phillip Kleman |
| Bid Date: | April 28, 2009 | Contract Awarded to: Tom Van Handel Construction Appleton, WI $47,818.00 |  |
| Location: | Garners Creek Communities Storm Water Utility, Wisconsin |
| Project: | 2009 Erosion Control Project |
| Contact: | Carl Sutter, P.E. |
| Bid Date: | April 22, 2009 | Contract Awarded to: Michels Corporation Brownsville, WI $178,814.00 |  |
| Location: | MENASHA UTILITY DISTRICT (Town Of), Wisconsin |
| Project: | 2009 CIPP PROJECT (Ehlers Road / Haase Road) |
| Contact: | Brad Werner, P.E. |
| Bid Date: | April 22, 2009 | Contract Awarded to: De Groot, Inc. Green Bay, WI $181,597.33 |  |
| Location: | MENASHA UTILITY DISTRICT (Town Of), Wisconsin |
| Project: | Glenview Drive Sanitary Sewer Reconstruction |
| Contact: | Brad Werner, P.E. |
| Bid Date: | April 08, 2009 | Contract Awarded to: Bodart Electric Service, Inc. Depere, WI $65,153.20 |  |
| Location: | Egg Harbor (Village of), Wisconsin |
| Project: | STH '42' DECORATIVE STREET LIGHTING |
| Contact: | Thomas J. Kispert, P.E. / Jennifer Schaff, P.E. |
| Bid Date: | April 08, 2009 | Contract Awarded to: Ronet Construction Corp. Green Bay, WI $289,271.60 |  |
| Location: | Kaukauna Utilities, City of Kaukauna, Wisconsin |
| Project: | 2009 WATER MAIN RECONSTRUCTION |
| Contact: | Brad Werner, P.E. |
| Bid Date: | April 08, 2009 | Contract Awarded to: Northeast Asphalt, Inc. Green Bay, WI $72,007.65 |  |
| Location: | Egg Harbor (Village of), Wisconsin |
| Project: | Sidewalk - STH '42' |
| Contact: | Thomas J. Kispert, P.E. / Jennifer Schaff, P.E. |
| Bid Date: | April 08, 2009 | Contract Awarded to: Don E. Parker Excavating, Inc. Hortonville, WI $737,295.65 |  |
| Location: | HORTONVILLE (Village Of), Wisconsin |
| Project: | 2009 Black Otter Subdivision Reconstruction |
| Contact: | Ron Wolf, P.E. |
| Bid Date: | April 01, 2009 | Contract Awarded to: Mueller Excavating Campbellsport, Wisconsin $201,441.00 |  |
| Location: | KEWASKUM (Village Of), Wisconsin |
| Project: | 2009 Hillside Drive / Habeck Street Reconstruction |
| Contact: | Jeffrey M. Hansen, P.E. |
| Bid Date: | March 30, 2009 | Contract Awarded to: Scott Construction Lake Delton, WI $179,753.14 |  |
| Location: | Menasha (Town of), Wisconsin |
| Project: | 2009 CHIP SEAL PROGRAM |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | March 30, 2009 | Contract Awarded to: American Pavement Solutions, Inc. Green Bay, WI $62,410.00 |  |
| Location: | Menasha (Town Of), Wisconsin |
| Project: | 2009 Crack Seal Program |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | March 23, 2009 | Contract Awarded to: Denny Rahn Excavating, Inc. Eden, WI $61,022.20 |  |
| Location: | Belgium (Village of), Wisconsin |
| Project: | MAPLE LAWN STORM WATER POND MODIFICATIONS |
| Contact: | Matt Greely, P.E. |
| Bid Date: | March 23, 2009 | Contract Awarded to: Advance Construction, Inc. Green Bay, WI $158,000.00 |  |
| Location: | Belgium (Village of), Wisconsin |
| Project: | MAPLE STREET SANITARY SEWER RELAY |
| Contact: | Matt Greely, P.E. |
| Bid Date: | March 23, 2009 | Contract Awarded to: Goldsmith Painting & Cleaning, Inc. Sheboygan Falls, WI $29,800.00 |  |
| Location: | Belgium (Village of), Wisconsin |
| Project: | WELL #2 PUMPHOUSE REPAIRS |
| Contact: | Matt Greely, P.E. |
| Bid Date: | March 12, 2009 | Contract Awarded to: Harbor Construction of Door County, Inc. Baileys Harbor, WI $68,915.15 |  |
| Location: | Egg Harbor (Village of), Wisconsin |
| Project: | 2009 BEACH IMPROVEMENTS |
| Contact: | Jennifer Schaff, P.E. |
| Bid Date: | March 04, 2009 | Contract Awarded to: Vinton Construction Co. Manitowoc, WI $402,115.90 |  |
| Location: | Kimberly (Village of), Wisconsin |
| Project: | 2009 STREET RECONSTRUCTION |
| Contact: | Brad Werner, P.E. |
| Bid Date: | March 04, 2009 | Contract Awarded to: Advance Construction, Inc. Green Bay, WI $707,812.85 |  |
| Location: | Kimberly (Village of), Wisconsin |
| Project: | 2009 SANITARY SEWER RECONSTRUCTION |
| Contact: | Brad Werner, P.E. |
| Bid Date: | March 04, 2009 | Contract Awarded to: Donald Hietpas & Sons, Inc. Little Chute, WI $162,094.25 |  |
| Location: | Kimberly (Village of), Wisconsin |
| Project: | KIMBERLY AVENUE WATER MAIN RECONSTRUCTION |
| Contact: | Brad Werner, P.E. |
| Bid Date: | March 03, 2009 | Contract Awarded to: Fleischman Excavating, Inc. Lomira, WI $397,438.40 |  |
| Location: | Lomira (Village of), Wisconsin |
| Project: | 2009 SANITARY SEWER, WATER MAIN & STREET RECONSTRUCTION GROVE STREET RAILROAD STREET |
| Contact: | Jennifer Schaff, P.E. |
| Bid Date: | March 02, 2009 | Contract Awarded to: Northeast Asphalt Greenville, WI $397,438.40 |  |
| Location: | Menasha (Town of), Wisconsin |
| Project: | 2009 ASPHALT STREET RESURFACING PROGRAM |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | March 02, 2009 | |  |
| Location: | PECATONICA (Village Of), Illinois |
| Project: | Wastewater Treatment Facility Modifications |
| Contact: | Timothy C. Bronn, P.E., BCEE |
| Bid Date: | February 26, 2009 | Contract Awarded to: MCC, Inc. Appleton, WI $369,163.10 |  |
| Location: | Chilton (City of), Wisconsin |
| Project: | 2009 ASPHALT PAVING & UTILITY RECONSTRUCTION |
| Contact: | Dennis Buschke, P.E. |
| Bid Date: | February 26, 2009 | |  |
| Location: | MACHESNEY PARK (Village Of), Illinois |
| Project: | Greenview Avenue Improvements |
| Contact: | John C. Zimmerman, P.E. |
| Bid Date: | February 25, 2009 | Contract Awarded to: Great Lakes TV Seal, Inc. Green Bay, WI $50,043.71 |  |
| Location: | Kimberly (Village of), Wisconsin |
| Project: | 2009 SANITARY SEWER CLEANING & TELEVISING AND SANITARY MANHOLE INSPECTIONS |
| Contact: | Brad Werner, P.E. |
| Bid Date: | February 25, 2009 | |  |
| Location: | MACHESNEY PARK (Village Of), Illinois |
| Project: | Evans Avenue Improvements |
| Contact: | Nick Arps, P.E. |
| Bid Date: | February 24, 2009 | Contract Awarded to: Northeast Asphalt, Inc. Greenville, WI $722,493.53 |  |
| Location: | Harrison (Town of), Wisconsin |
| Project: | 2009 ASPHALT PAVING PROGRAM |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | February 24, 2009 | Contract Awarded to: Donald Hietpas & Son's, Inc. Little Chute, WI $954,664.70 |  |
| Location: | Menasha (Town of), Wisconsin |
| Project: | 2009 WATER MAIN RELAY PROJECT |
| Contact: | Lee Reibold, P.E. |
| Bid Date: | February 24, 2009 | |  |
| Location: | MACHESNEY PARK (Village Of), Illinois |
| Project: | Marie Avenue Improvements |
| Contact: | Nick Arps, P.E. |
| Bid Date: | February 16, 2009 | |  |
| Location: | PECATONICA (Village Of), Illinois |
| Project: | Wastewater Treatment Facility Modifications |
| Contact: | Timothy C. Bronn, P.E., BCEE |
| Bid Date: | February 10, 2009 | Contract Awarded to: MCC, Inc. Appleton, WI $154,512.39 |  |
| Location: | Grand Chute (Town of), Wisconsin |
| Project: | 2009 HOT MIX ASPHALT PAVING PROGRAM |
| Contact: | Carl Sutter, P.E. |
| Bid Date: | February 03, 2009 | |  |
| Location: | Lomira (Village of), Wisconsin |
| Project: | NEW MUNICIPAL COMPLEX |
| Contact: | Mike McMahon, AIA |
| Bid Date: | January 29, 2009 | Contract Awarded to: Ceroni Piping Company, Inc. Belvidere, IL $12,000.00 |  |
| Location: | ROCKFORD (City Of), Illinois |
| Project: | Millennium Fountain Pumping System Repairs |
| Contact: | Donald J. Voogt, P.E. |
| Bid Date: | January 27, 2009 | Contract Awarded to: MCC, Inc. Appleton, WI $1,372,639.54 |  |
| Location: | Grand Chute (Town of), Wisconsin |
| Project: | CASALOMA WEST URBANIZATION |
| Contact: | Carl Sutter, P.E. |